Birmingham New Street Tunnel.
650m2 Delta drainage system with sprayed concrete & onecoat plaster finish.
Eeemshaven, Netherlands.
350 tonnes of lightweight refractory lining to recycling plant.
Ore Tunnel, Hastings.
500m3 steel fibre reinforced shotcrete, robotically applied to replace defective brickwork during a 14 day blockade.

















